This website uses cookies. Cookies are used for the purposes of user guidance and web analysis and help to make this website better and more user-friendly. Click here for more information: Imprint
X
  • Voith double girder vertical plate magnet crane
  • Clearing away with a large, strong removal magnet. Thanks to the special inclined rope stabilisation there is no oscillation in any direction and in addition the crossbeam is prevented from tilting
  • Thicker plates are taking by the single magnet that can be rotated
  • Plates can also be taken horizontally
  • Changing to the vertical plate crossbeam
  • Electrical contacts are closed automatically
  • Tilting the magnet to remove flame cuts from the vertical store
  • It can also be tilted in the opposite direction
INCLINED ROPE STABILISATION
Project
ISW
 
With Voith cranes we can “clear away” properly, using the cranes has been a success, above all in the storage area. (Peter Limberger, ISW Production Manager)
 
Would you like to print the result with or without pictures?
 
PROJECT
ISW
The crane’s task is to handle plates up to a size of 12 x 4m. Large plates are stored vertically and laid on a flame cutting table for processing. The cut plates, as well as the remnants, are picked up by a removal magnet. Very large, thick plates are also cut that cause problems when lifted from the flame cutter.
 
For this reason, the magnet can be tilted in any direction for optimum removal of the material. The Voith replaceable hanger is used to replace both hangers. It automatically closes all contacts and the replacement is only made when a switch is pressed on the remote control unit.
TECHNICAL DATA
Design: Double girder crane
Capacity: 25 t
Crane group: H2 E3
Wheel track: 31.000 mm
Lift speed: Full load 0 - 9,4 m/min; part load 0 - 22 m/min
Trolley speed: 0 - 40 m/min
Crane traveling speed: 0 - 90 m/min
Number of trolleys: 1
 
CONTACT US
TELEPHONE
+43 7229 70 270 - 0
EMAIL