  • Automated transport of segments
  • Voith automatically administers the storage area according to arrival date and time
  • A second crane placing the segments on a tilting table
  • After being tilted the automatic crane automatically collects the segment
  • After having hardened for at least 24 hours the segments are removed from the storage area
CONCRETE/CONSTRUCTION INDUSTRY
Project
MABA
 
 
Would you like to print the result with or without pictures?
 
PROJECT
MABA
The crane’s task was to place reinforcing steel coils in a defined interim storage area for at least 24 hours for them to harden. The crane was to do this completely automatically. Signals are exchanged digitally between the inbound and outbound storage locations. The segments are placed directly on transport cars also supplied by Voith.
 
The hanger is stabilised by means of patented inclined rope stabilisation. The segments to be lifted need to be moved by the crane as they are lifted mechanically from below.
TECHNICAL DATA
Design: Single girder angle traveling crane
Capacity: 12 t
Crane group: H2 E3
Wheel track: 20.000 mm
Lift speed: Full load 0 - 8,1 m/min; part load 0 - 20,3 m/min
Trolley speed: 0 - 40 m/min
Crane traveling speed: 0 - 90 m/min
Number of trolleys: 1
Specialist functions: Mechanical hanger
 